Excellence is Expected

Sheffield Pioneer 8.10.6 CMM Unit to QA Dept.

CWM’s Quality Assurance Dept. recently installed a Sheffield Pioneer 8.10.6 CMM machine, paving the way to acquiring the latest sophisticated inspection software: PC-DMIS Cad++.

This advanced software integrates directly with 3D CAD modeling, allowing for inspection programming before the die cast product sample is available. Thus, the lead time for providing a first-article inspection report is greatly reduced.

Complex parts can be measured quickly with extreme accuracy, and operator error can be virtually eliminated.

Related Posts

CWM Recycling Stats – October 2024

In October 2024, CWM successfully diverted significant materials from landfills, continuing our commitment to sustainability. Here’s what we processed: Overall, in October 2024, CWM diverted

CWM Recycling Stats – September 2024

In September 2024, CWM sent the following materials to Imperial Recycling for processing: Additionally, our partner Groot collected approximately 630 lbs. of mixed recyclables, including